A rejection by the fire brigade, the municipality, the safety region or your insurer means a remediation deadline. We go through the findings, remediate with tested systems and supply the documentation that gets you through the re-inspection.
A rejected fire separation is a nuisance, but rarely a disaster. In the vast majority of cases it involves a limited number of concrete defects that can be remedied within the set deadline using the right systems and watertight documentation.
What surprises most owners and managers is that the second part weighs just as heavily as the first. Repairs that are technically sound but not recorded come back at the re-inspection. Good records help to show that the provision is present, correctly executed and maintained.
What we do after a rejection
- Going through the report or enforcement letter and assessing what genuinely needs remediation.
- An on-site survey, including comparable situations not yet spotted.
- An itemised quote, prioritised by what is mandatory and what can wait.
- Execution with tested systems by VCA-certified fitters.
- Handover file and digital logbook for the re-inspection.
Deadline running out?
With a remediation deadline running, we schedule the survey as a priority. Being demonstrably in motion counts: an issued order and a concrete schedule give room in enforcement with virtually every competent authority.
Our team works VCA-certified and our organisation is ISO 9001 and Kiwa (K21050) certified. That is exactly the substantiation asked for at a re-inspection.
Get in touchFrom rejection to approval
Read exactly what was rejected
A rejection names concrete defects: unsealed penetrations, a door that does not close, a missing classification. Gather the letter or report, the permit drawings and any earlier inspection reports. That is the basis for everything that follows.
Acknowledge receipt and ask for leeway where needed
Respond to the competent authority or the insurer, even if you do not yet know what the repair will cost. Being demonstrably in motion often counts in how strictly a deadline is enforced.
Have the true scope established
A report names the defects found, not necessarily all defects. We verify the findings on site and immediately look at comparable situations elsewhere in the building, so you are not rejected again in three months for the same type of defect.
Repair with tested systems
Product and installation method must together fall within the field of application of a valid classification. A seal applied with the wrong system or outside the tested build-up is a defect again at re-inspection.
Record the remediation and submit the file
Per repair point: location, system applied, product documentation, date, installer and photo. That file is what closes the re-inspection - and what shows at the next inspection that you are in control.
What is rejected most often?
Six defects together account for the vast majority of all rejections on structural fire protection.
Unsealed or modified penetrations
A common reason. A cable or pipe pulled through an existing seal later often falls outside the system's substantiated field of application - even if the hole looks small. How we repair it is explained on our page about fire-stopping.
Fire doors that do not close
An incorrectly adjusted closer, a wedge under the door or damaged hardware. A fire door that does not latch does not do its job in a fire and is recorded as a defect during an inspection.
Separations that do not continue through
A wall or flame screen that stops at the suspended ceiling instead of continuing to the floor above or the roof. Above the ceiling the separation is then open.
Missing documentation
The work may have been done correctly, but there is no product documentation, no record and no photo. Then it cannot be shown what was done, and during an inspection the seal often has to be opened up or investigated after all.
Fire dampers that do not function
A jammed mechanism, a missing perimeter seal or a damper that has become inaccessible for inspection after a refurbishment.
Damaged structural protection
Fire-resistant cladding or coating damaged during later construction traffic and never repaired, leaving the steel locally unprotected.
Four parties, the same requirement
| Who | What is assessed | What happens if you fail to act |
|---|---|---|
| Municipality / environmental agency | Whether the building complies with the Bbl and the permit | Enforcement process, order subject to a penalty payment |
| Safety region / fire brigade | Advises on compartmentation, escape routes and fire-safe use, and may be involved in supervision | Advice or report to the competent authority; enforcement goes through the municipality |
| Insurer | Sometimes additional requirements on top of the legal minimum, depending on the policy | Depending on the policy: additional conditions, a higher premium or excess, or discussion about cover after a loss |
| Certification body | Whether a certified company works according to the requirements of the certification scheme | Measures against the company, up to suspension or withdrawal of the certificate |
What they often have in common: the statement that it has been repaired is not enough. They want to see with what, by whom and when.
Questions after a rejection
That is stated in the letter or report. The period depends on the seriousness of the defect and differs per case. In case of acute danger, action can be taken immediately. If you take demonstrable steps - order placed, schedule known - there is often room in practice to discuss the period.
That depends on what was rejected. Re-sealing individual penetrations is a matter of a unit price per penetration; adjusting or overhauling a fire door is often a fraction of replacement. A complete catch-up programme across several floors is a project with its own budget. After the survey you know per item what it costs and what is mandatory versus recommended.
Not always. What directly affects the safety of escape routes and compartment boundaries takes priority. The rest can often be phased, provided you can show a plan with deadlines. We prioritise the findings so that you first do what is required and the rest becomes plannable and budgetable.
Usually the party that issued the rejection: in an enforcement case the competent authority, usually the municipality, often advised by the fire service. For insurance requirements it is the insurer's inspector. In both cases evidence is requested: which system was applied, by whom, when, and whether the work falls within the classification's field of application. We supply that file as standard.
Yes. Sometimes a rejection is less serious than it reads, or part of the findings can be refuted with substantiation. We go through the report and indicate what genuinely needs remediation and what does not - that sometimes saves a considerable share of the cost.
Yes. With a running remediation deadline or a threatened closure, we schedule the survey at short notice and start in stages where necessary, so the most important defects are cleared first.
What needs to be put right
Fire-Resistant Seals
Sealing penetrations against fire with collars, wrap strips, sealant, mortar or other systems with a substantiated application, so that the WBDBO of your fire separation stays intact.
More about fire-resistant sealsFire-Resistant Doors
Fire doors made to measure, adjusted or refurbished: up to 60 minutes fire resistance, smoke-resistant where required, self-closing and certified.
More about fire-resistant doorsFire-Resistant Separating Structures
Fire-resistant walls, partition systems and ceilings that divide your building into manageable fire compartments.
More about fire-resistant separating structuresActive in: Den Haag · Rotterdam · Zuid-Holland · Utrecht · Amsterdam and more